FCC Requirements
JAN 2002
xxi
SC
300 1X BTS Hardware Installation, ATP, and FRU Procedures
DRAFT
Content
This section presents Federal Communications Commission (FCC)
Rules Parts 15 and 68 requirements and compliance information for the
SC
300 Microcell Base Transceiver Subsystems (BTS).
Warning – Radio Frequency
Radiation Hazard
This equipment is designed to generate and radiate radio
frequency (RF) energy. It should be installed and
maintained only by trained technicians. Licensees of the
Federal Communications Commission (FCC) using this
equipment are responsible for insuring that its installation
and operation comply with FCC regulations (47 C.F.R. &
1.1310) designed to limit human exposure to RF radiation.
WARNING
Maximum Permissable
Exposure (MPE) Limit Warning
In order to comply with the FCC guidelines on RF exposure, the
antennas for this equipment must not exceed the maximum gain shown
in the MPE Limits table. Antennas must be installed more than the
minimum distance specified in the MPE Limits table away from persons.
No antenna used with this equipment should be installed in a location in
which any persons are likely to be within the maximum persmissable
distance from the antenna.
Verify that transmitter output is turned off before
performing antenna service within the restricted area.
WARNING
MPE Limits
Parameter
Frequency
800 MHz
1.9 GHz
Maximum Gain
5.2dBd
5.5dBi
Distance
1.0m (40 in.)
0.5m (20 in.)
RF Antenna Warning Labels
Your BTS is shipped with one of two different warning labels depending
upon the frequency:
800 MHz – Motorola Part Number 5488229C09 (1 m label)
1.9 GHz – Motorola Part Number 5488229C10 (0.5 m label)
You must affix the label to a visible surface near the antenna for all
indoor antenna mounting applications. The label(s) must be visible from
Содержание SC 300
Страница 30: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 1 ...
Страница 60: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 2 ...
Страница 76: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 3 ...