Table of Contents
– continued
DRAFT
SC
300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
ii
Chapter 4: Preparing Site Cabling for Sites Equipped with
Customer–Supplied Site I/O Interface
Cabling Overview
4-1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cable Descriptions
4-2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Site Cabling for BTS With Customer–Supplied Site I/O Interface
4-6
. . . . . . . . . .
Power, Ground, and Battery Cabling for Sites Equipped with
Customer–Supplied Site I/O Interface
4-10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Antenna Cabling for Sites Equipped with
Customer–Supplied Site I/O Interface
4-15
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Site I/O , Span Line, RGPS and Modem Cabling for
Sites Equipped with Customer–Supplied Site I/O Interface
4-18
. . . . . . . . . . . . . . .
RGPS Cabling for Multiple BTS Sites
4-24
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Span Line Daisy Chain Cabling
4-32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 5: Preparing Site Cabling for Sites Equipped with
Optional Primary Surge Suppressor
Cabling Overview
5-1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Site Cabling for BTS With Optional Primary Surge Suppressor
5-2
. . . . . . . . . . . .
Attaching the Surge Suppressor to Mounting Bracket
5-6
. . . . . . . . . . . . . . . . . . . .
Power, Ground, and Battery Cabling for Sites Equipped with
Optional Primary Surge Suppressor
5-8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Antenna Cabling for Sites Equipped With Optional Primary Surge Suppressor
5-13
Site I/O, Span Line, RGPS, and Modem Cabling for Sites Equipped With
Primary Surge Suppressor
5-17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
RGPS Cabling for Multiple BTS Sites Equipped with
Optional Primary Surge Suppressor
5-24
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Span Line Daisy Chain Cabling for Multiple BTS Sites Equipped with
Optional Primary Surge Suppressor
5-32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Chapter 6: Installing the Unit and Installation Check Off List
Unit Installation Overview
6-1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Connector Locations
6-2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Attaching Back Fin Cover to Unit
6-5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Attaching Optional Installation Handles to the Unit
6-6
. . . . . . . . . . . . . . . . . . . . .
Attaching Unit to Mounting Bracket
6-8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Earth Ground Cabling
6-10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Attaching the Site I/O Junction Box to the Unit
6-13
. . . . . . . . . . . . . . . . . . . . . . . .
Subscriber Unit (SU) Installation and Cabling
6-15
. . . . . . . . . . . . . . . . . . . . . . . . . .
Attaching Front Fin Cover to Unit
6-18
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Attaching the Short Duration Battery to the Unit (optional)
6-19
. . . . . . . . . . . . . . .
Short Duration Battery Cabling
6-21
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Содержание SC 300
Страница 30: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 1 ...
Страница 60: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 2 ...
Страница 76: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 3 ...