ATP Tools and Materials
– continued
DRAFT
SC
300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
1-14
Test Equipment List
The following pieces of test equipment are required during the ATP.
Common assorted tools like screwdrivers and keys are not listed but are
still required. Read the owners manual on all of the following major
pieces of test equipment to understand their individual operation prior to
use in optimization.
Always refer to specific OEM test equipment
documentation for detailed operating instructions.
NOTE
CDMA LMF Hardware Requirements
A CDMA LMF computer platform that meets the following
requirements (or better) is recommended:
Notebook computer
266 MHz (32 bit CPU) Pentium processor
4 Gbyte internal hard disk drive
Color display with 1024 x 768 resolution
128 MB RAM
CD ROM drive
3 1/2 inch floppy drive
Serial port (COM 1)
Serial port (COM 2)
Parallel port (LPT 1)
PCMCIA Ethernet interface card (for example, 3COM Etherlink III)
with a 10Base–T–to–coax adapter
Windows 98 SE
If 800 x 600 pixel resolution is used, the CDMA LMF
window must be maximized after it is displayed.
NOTE
RS232 to GPIB Interface
One National Instruments GPIB–232–CT with Motorola
CGDSEDN04X RS232 serial cable or equivalent; used to interface the
LMF to the test equipment.
A Standard RS–232 cable can be used with the following modifications:
Pin 8 (CTS) does not have to be jumpered/shorted to the others as it is
a driver output. The DTR is already a driver output signal. The other
pins are to receivers. Short pins 7, 1, 4, 6 on each cable end:
1
Содержание SC 300
Страница 30: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 1 ...
Страница 60: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 2 ...
Страница 76: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 3 ...