30
Molift Air / www.molift.com
Molift Air / www.molift.com
Periodic Inspection Checklist Molift Air
In accordance with ISO:10535 2006 Annex B.
Article no.:
...........................................................................................
Serial no.:
...........................................................................................
Production Year:
...........................................................................................
Owner:
...........................................................................................
Sling serial number:
...........................................................................................
Sling Inspected separately and is not
included in this inspection.
Situation of use:
Home
Institution (type of institution):
Hospital
Nursing home
Other
Service light indicator
Service not required when service light indicator
displays green and if hoist is under 5 years old
Service light displays green
Hoist is less then 5 years old
Physical examination
Test FUNCTION and check for wear.
All checkpoints must be checked of
to approve lifter for further use.
Perform 1 lifting cycle with SWL.
Brake shall not slip when loaded with SWL
Emergency stop
Electrical Emergency lowering
Handcontrol (buttons, strain relief, hook,
battery indicator)
Suspension coupling (change of suspension,
QR pin, rotation and swivel funktion)
Both Quick release couplings (connect to
trolley)
Angle sensor (pull band sideways)
Charger/Battery
Accessories (t.ex: Scale, Propulsion, IRC):
...........................................................................................
...........................................................................................
Visual examination
Visual examination of load bear-
ing structure to make sure there
is no damage, cracks, frays or
deformation. All checkpoints must
be checked of to approve lifter for
further use.
Product labels
Plastic covers
Hand control
Gearhouse (pay special attention to lifting
ears, remove upper cover)
Cables and other electronics.
Lifting band
Suspension coupling
Suspension (especially composite hooks)
Performed by
Periodic inspection should be performed by a
person who is certified by Etac education.
Date/Place:
...........................................................................................
Signature:
...........................................................................................
Etac Molift Service ID (6 digits):
...........................................................................................
Approved without faults
Approved after repair.
Lifter is marked with “out of order” and
sent for repair.
Hoist is not eligible for repair and taken out
of service.
If periodic inspection reveals any defect, wear or
other damage that jeopardizes the safety of the
patient it may not be used until the deficiency has
been eliminated. Defects and damages should be
reported back to the manufacturer for action in a
non-conformity report (NCR).
The owner is notified
NCR report sent to Etac, [email protected]
Non conformity report can be obtained from
www.molift.com or by request, [email protected].
PI16101 Rev A 2013-10-22
Содержание Air 300
Страница 1: ...TM16101 Rev A 2013 11 14 Molift Air EN Technical manual...
Страница 8: ...7 Molift Air www molift com Air Basic Exploded Drawing 20 001 Rev K Air Components...
Страница 10: ...9 Molift Air www molift com Air IRC Basic Exploded Drawing 20 012 Rev E...
Страница 35: ...34 Molift Air www molift com Notes...