33
Molift Air / www.molift.com
Installation
Assembly and installation
The hoist is marked with Safe Working Load
(SWL), this should not exceed rail systems SWL
capacity.
The rail system can only be
installed by certified personnel inn
accordance with applicable installa-
tion instructions.
Do not start using hoist before
completing control according to
checklist after installation.
Trolley installation
Mounting trolley in rail system
Remove End stop and insert Trolley into rail.
Mount end stop, and make sure it is securely
fastened
Make sure end stops are mounted
in all ends of the Rail system before
using the hoist!
Lifter installation
Mounting of Lifter on trolley. No tools required.
The lifter has two connection points.
Connect one point first. Push button all the way
in, and place lifter in connection point on trolley.
Release button and make sure it is clearly show-
ing green before connecting the next point.
Make sure both connection point buttons
completely return and clearly show green after
installation.
Checklist after installation
Use this checklist to verify that the hoist is properly
installed and can operate correctly and safely
before use.
End stops on rail are installed after mounting
of trolley
Make sure that the hoist is properly fastened
to the rail and that the lift does not have any
loose parts.
Perform one lift with normal load (60-80 kg)
Make sure battery is fully charged.
Содержание Air 300
Страница 1: ...TM16101 Rev A 2013 11 14 Molift Air EN Technical manual...
Страница 8: ...7 Molift Air www molift com Air Basic Exploded Drawing 20 001 Rev K Air Components...
Страница 10: ...9 Molift Air www molift com Air IRC Basic Exploded Drawing 20 012 Rev E...
Страница 35: ...34 Molift Air www molift com Notes...