![Mitsubishi MELFA 4D-2CG5100-PKG-E Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/mitsubishi/melfa-4d-2cg5100-pkg-e/melfa-4d-2cg5100-pkg-e_instruction-manual_1808016034.webp)
5
Equipment preparation and connection
5-23 Equipment preparation
5. Equipment preparation and connection
This chapter explains how to prepare necessary equipment, connect it to the system, etc., using a system with
one vision sensor and one robot controller as an example.
5.1.
Equipment preparation
The following equipment is required for building the vision system. Included is equipment that must be
provided by the customer, so prepare what is necessary for your system.
Table 5-1 List of Configuration When One Camera Is Used
Part name
Format
Manufacturer
Q'ty
Remarks
Robot controller
CRn-500 series
1
Software:
K6
or later
Robot main unit
All models
1
Teaching box
R28TB
1
Ethernetinterface card
(
*1
)
2A-HR533
1
Vision sensor
In-Sight 5000 series
1
Software:
3.20
or later
Breakout cable
1
Network
vision sensor
basic set
Network cable
Mitsubishi
Electric
1
Lens
C mount lens
-
1
24V power supply
-
-
1
PC
-
-
1
Hub
-
-
1
Ethernet cable (straight)
-
-
2
Lightning device
-
-
1
Provided by customer
Robot hand
-
1
Hand interface card
2A-RZ365
Mitsubishi
Electric
1
Equipment arranged for as
necessary
(
*1
)
When a CR1 or CR1B robot controller is used, the expansion option box is required.