![Mitsubishi Electric MELSEC iQ-R04ENCPU Скачать руководство пользователя страница 374](http://html.mh-extra.com/html/mitsubishi-electric/melsec-iq-r04encpu/melsec-iq-r04encpu_user-manual_239140374.webp)
372
APPX
Appendix 7 Processing Time
Safety data holding time when system switching occurs
This section describes safety data holding time when system switching occurs in a system using the SIL2 Process CPU.
Redundant master station
The following are the formulas to calculate safety data holding time when system switching occurs in the redundant master
station configuration.
*1
*1 The variables in the equation have the following meaning.
*2 For delay time until detection of the system switching cause, refer to the following.
MELSEC iQ-R CPU Module User's Manual (Application)
*3 Depending on the failure status of the power supply module, the calculation formula of the safety data holding time (SH) may be as
follows.
500+Tsw+Tso+TMmst
*4 When the redundant function module is disconnected from the base unit or depending on the failure status of the base unit, the safety
data holding time (S
H
) may be calculated by the following formula.
2.5 + (2
LS) + Tsw + Tso + TMmst
Pattern No.
System switching cause
Safety data holding time (S
H
) [ms]
Timing chart
1
• Failure of the control system power supply module
• Power-off of the control system
• Failure of the control system SIL2 Process CPU
• Failure of the control system base unit
• Failure of the control system redundant function
module
Delay time until detection of the system switching
cause
+ Tsw + Tso + TMmst
2
• Stop error of the control system SIL2 Process CPU
• Execution of the system switching instruction
• System switching request from the engineering tool
• System switching request from another network
module
Delay time until detection of the system switching
cause
+ Tsw + Tso + TMmst
3
System switching request
from the RJ71GF11-T2
(own station)
Own station data link
error
310 + (3
Ls) + Tc + Tsw + Tso + TMmst + SS
4
Communication error with
the system switching
monitoring target station
210+Tc+Tsw+Tso+TMmst+SS
Variable
Meaning
Tsw
SIL2 Process CPU system switching time [ms] (
MELSEC iQ-R CPU Module User's Manual (Application))
Tso
Delay time until initial safety output after system switching (
MELSEC iQ-R CPU Module User's Manual (Application))
TMmst
Transmission interval monitoring time of the master station (safety station) [ms] (
Page 348 Transmission interval monitoring time)
SS
SIL2 Process CPU sequence scan time [ms] (
MELSEC iQ-R CPU Module User's Manual (Application))
Tc
System switching monitoring time setting value [ms] (
Page 139 Supplementary Cyclic Settings)
LS
Link scan time [ms] (
Содержание MELSEC iQ-R04ENCPU
Страница 2: ......
Страница 61: ...1 FUNCTIONS 1 3 IP Packet Transfer Function 59 1 ...
Страница 385: ...383 I Transient transmission 15 ...
Страница 389: ......