![Mitsubishi Electric MELSEC iQ-R04ENCPU Скачать руководство пользователя страница 120](http://html.mh-extra.com/html/mitsubishi-electric/melsec-iq-r04encpu/melsec-iq-r04encpu_user-manual_239140120.webp)
118
1 FUNCTIONS
1.8 Safety Communication Function
Procedures before operation
This section describes the procedures for operating the system using the SIL2 Process CPU.
■
Mounting procedures
1.
Installation of batteries
Install batteries to the SIL2 Process CPU of both systems. (
MELSEC iQ-R CPU Module User's Manual (Startup))
2.
Installation of an extended SRAM cassette or an SD memory card
Install an extended SRAM cassette or an SD memory card to the SIL2 Process CPU of both systems as necessary. (
MELSEC iQ-R CPU Module User's Manual (Startup))
Do not power off or reset the system or eject the SD memory card during access to the SD memory card.
(
MELSEC iQ-R CPU Module User's Manual (Application))
3.
Mounting of the module
Mount each module on the base unit. (
MELSEC iQ-R Module Configuration Manual)
■
Wiring procedures
1.
Wiring
Connect each module and external devices.
■
Procedures for the remote head module
1.
Power-on of the system
Before turning on the power, check the following items.
• The power supply is connected properly.
• The power supply voltage meets the specifications.
• The remote head module is in the STOP state.
2.
Creation of a project
Start the engineering tool and create a project. (
MELSEC iQ-R CC-Link IE Field Network Remote Head Module User's
Manual (Startup))
3.
Connection between a personal computer and the remote head module
Connect a personal computer with the engineering tool installed to the remote head module. (
MELSEC iQ-R CC-Link IE
Field Network Remote Head Module User's Manual (Startup))
4.
Initialization of the remote head module
Initialize the remote head module using the engineering tool. (
MELSEC iQ-R CC-Link IE Field Network Remote Head
Module User's Manual (Startup))
5.
Parameter setting of the remote head module
Set the system parameters, CPU parameters, and module parameters of each module. (
MELSEC iQ-R CC-Link IE Field
Network Remote Head Module User's Manual (Application))
• Setting of the system parameters and the CPU parameters
• Setting of the module parameters of each module
6.
Writing to the remote head module
Write the parameters set by the engineering tool to the remote head module. (
MELSEC iQ-R CC-Link IE Field Network
Remote Head Module User's Manual (Startup))
Wiring location
Reference
Wiring for the power supply module
MELSEC iQ-R Module Configuration Manual
Wiring for the redundant function module
MELSEC iQ-R CPU Module User's Manual (Application)
Wiring from the RJ71GF11-T2 to the remote head module
•
MELSEC iQ-R Ethernet/CC-Link IE User's Manual (Startup)
•
MELSEC iQ-R CC-Link IE Field Network Remote Head Module User's
Manual (Startup)
Wiring for the I/O module
Manual for the I/O module used
Содержание MELSEC iQ-R04ENCPU
Страница 2: ......
Страница 61: ...1 FUNCTIONS 1 3 IP Packet Transfer Function 59 1 ...
Страница 385: ...383 I Transient transmission 15 ...
Страница 389: ......