-62-
(13) Control at initial starting
• When the ambient temperature is low (5˚C or less in cooling and – 5˚C or less in heating), initial starting will be
performed if the unit is started within 4 hours of the power being turned on.
• The following initial start mode will be performed when the unit is started for the first time after the power has
been turned on.
<Flow chart of initial start mode>
Start of initial operation mode
Initial operation mode is finished.
Step 1
•
•
•
Only the No.1 compressor is operated (f 75 Hz)
Operation of the No.2 compressor is prohibited.
Finished when cumulative operating time reaches
30 minutes.
Pause Step
• Both compressors are stopped, regardless of the
demand from the indoor units. (3 minutes)
Step 2
•
•
•
Only the No.1 compressor is operated.
Operation of the No.2 compressor is prohibited.
Operates continuously for 10 minutes and finishes.
Step 3
•
•
Both compressors, No.1 and No.2, are operated
(Forced)
Finished when cumulative operating time reaches
30 minutes.
At the completion of Step
2, if the frequency of No.1
compressor is below the
specified value and if Step
2 has been completed less
than 3 times, the process
does not proceed to Step 3
but rather enters the
Pause Step and then
repeats Step 2.
Содержание CITY MULTI PUHY-400YMF-C
Страница 15: ... 12 FANCON board G A board CNFAN CNFC2 CNPOW CNE CNDC1 CN15V1 CNDR1 CNIPM1 ...
Страница 16: ... 13 Y C board SNB board ...
Страница 17: ... 14 RELAY board CNRT2 CNCH CN52C2 CN52F CN51C2 CNOUT2 ...
Страница 19: ... 16 CONT board CNTR SWU2 SWU1 SW3 SW2 CNS1 M NET transmission CNFC1 CN20 Power supply 1 N 3 L1 ...
Страница 20: ... 17 FANCON board CNW CNV CNU CNFC2 ...
Страница 149: ... 146 Motor Compressor G A board Red U V W N P White Black Black Capacitor C2 C3 Red IPM ...
Страница 207: ......
Страница 208: ......
Страница 209: ......