[4] Airtightness Test
No changes from the conventional method. Note that a refrigerant leakage detector for R22 cannot detect R407C
leakage.
Halide torch
R22 leakage detector
Items to be strictly observed :
1. Pressurize the equipment with nitrogen up to the design pressure and then judge the equipment’s airtightness,
temperature variations into account.
taking
2. When investigating leakage locations using a refrigerant, be sure to use R407C.
3. Ensure that R407C is in a liquid state when charging.
Reasons :
1. Use of oxygen as the pressurized gas may cause an explosion.
2. Charging with R407C gas will lead the composition of the remaining refrigerant in the cylinder to change and
refrigerant can then not be used.
this
Note :
•
A leakage detector for R407C is sold commercially and it should be purchased.
[5]
Vacuuming
1. Vacuum pump with check valve
A vacuum pump with a check valve is required to prevent the vacuum pump oil from flowing back into the
circuit when the vacuum pump power is turned off (power failure).
refrigerant
It is also possible to attach a check valve to the actual vacuum pump afterwards.
2. Standard degree of vacuum for the vacuum pump
Use a pump which reaches 0.5 Torr (500 MICRON) or below after 5 minutes of operation.
In addition, be sure to use a vacuum pump that has been properly maintained and oiled using the specified oil. If
vacuum pump is not properly maintained, the degree of vacuum may be too low.
the
3. Required accuracy of the vacuum gauge
Use a vacuum gauge that can measure up to 5 Torr. Do not use a general gauge manifold since it cannot
vacuum of 5 Torr.
measure a
4. Evacuating time
•
Evacuate the equipment for 1 hour after –755 mmHg (5 Torr) has been reached.
•
After envacuating, leave the equipment for 1 hour and make sure that the vacuum is not lost.
5. Operating procedure when the vacuum pump is stopped
In order to prevent a backflow of the vacuum pump oil, open the relief valve on the vacuum pump side or loosen
charge hose to drawn in air before stopping operation.
the
The same operating procedure should be used when using a vacuum pump with a check valve.
Содержание CITY MULTI PUHY-400YMF-C
Страница 15: ... 12 FANCON board G A board CNFAN CNFC2 CNPOW CNE CNDC1 CN15V1 CNDR1 CNIPM1 ...
Страница 16: ... 13 Y C board SNB board ...
Страница 17: ... 14 RELAY board CNRT2 CNCH CN52C2 CN52F CN51C2 CNOUT2 ...
Страница 19: ... 16 CONT board CNTR SWU2 SWU1 SW3 SW2 CNS1 M NET transmission CNFC1 CN20 Power supply 1 N 3 L1 ...
Страница 20: ... 17 FANCON board CNW CNV CNU CNFC2 ...
Страница 149: ... 146 Motor Compressor G A board Red U V W N P White Black Black Capacitor C2 C3 Red IPM ...
Страница 207: ......
Страница 208: ......
Страница 209: ......