-60-
(11) Outdoor unit heat exchanger capacity control
1) Control method
•
In order to stabilize the evaporation temperature during cooling and the high-pressure pressure during heating
are required in response to performance needs, the capacity of the outdoor heat exchanger is controlled by
the fan volume of the outdoor unit by phase control and controlling the number of fans and by using
valves to vary the number of out door heat exchangers being used.
the solenoid
2) Control
•
When both of the compressors are stopped, the fans for the outdoor units are also
regulating
stopped.
•
The fans operate at full speed for 5 seconds after starting.
•
The fans for the outdoor unit are stopped during defrosting.
3) Capacity control pattern
(10) Refrigerant recovery control
Refrigerant recovery is conducted to prevent refrigerant from accumulating in the stopped unit (fan unit), the unit under
cooling mode and that with heating thermostat being turned off.
1) Start of refrigerant recovery
1 Refrigerant recovery is started when the two items below are fully satisfied.
• 30 minutes has passed after finishing refrigerant recovery.
• The level detector detects AL = 0 for 3 minutes continuously, or the discharge SH is high.
2) Refrigerant recovery operation
•
Refrigerant is recovered by opening LEV of the objective indoor units (indoor units under stop. fan, and
modes, and that with heating thermostat being turned off) for 30 seconds.
cooling
•
The regular capacity control of the outdoor unit and the regular LEV control of the indoor unit are not applied
refrigerant recovery operation, but are fixed with the value before the recovery operation. These
conducted one minute after finishing the recovery operation.
•
Defrosting operation is prohibited during the recovery operation, and it will be conducted after finishing
operation.
the recovery
Starts
LEV opening
before change
LEV opening at refrigerant recovery
(Indoor unit LEV opening 500 pulse)
Finish
30 seconds
Note 1:
Note 2: When there is conductivity at SV7, it is open. When there is no conductivity at SV7, it is closed.
Note 3: When the unit is stopped, and SV5b and SV8 are open. SV7 is close.
Operating mode Capacity control pattern Heat exchanger capacity No. of fans Phase control
Notes
2
3
1
1
50 %
1
10 to 100 %
100 %
2
10 to 100 %
100 %
2
10 to 100
%
100 %
0
0 %
Cooling
Heating
Defrosting
21S4bON, SV7 ON
SV5bON, SV8 OFF
1
25 %
1
10 to 100 %
21S4bON, SV7 OFF
SV5bON, SV8 ON
21S4bOFF, SV7 ON
SV5bOFF, SV8 OFF
21S4bON, SV7 ON
SV5bOFF, SV8 OFF
21S4bOFF, SV7 ON
SV5bOFF, SV8 OFF
during
controls will be
that
When there is conductivity at SV5b and SV8, it is closed. When there is no conductivity at SV5b and
SV8, it is open.
Содержание CITY MULTI PUHY-400YMF-C
Страница 15: ... 12 FANCON board G A board CNFAN CNFC2 CNPOW CNE CNDC1 CN15V1 CNDR1 CNIPM1 ...
Страница 16: ... 13 Y C board SNB board ...
Страница 17: ... 14 RELAY board CNRT2 CNCH CN52C2 CN52F CN51C2 CNOUT2 ...
Страница 19: ... 16 CONT board CNTR SWU2 SWU1 SW3 SW2 CNS1 M NET transmission CNFC1 CN20 Power supply 1 N 3 L1 ...
Страница 20: ... 17 FANCON board CNW CNV CNU CNFC2 ...
Страница 149: ... 146 Motor Compressor G A board Red U V W N P White Black Black Capacitor C2 C3 Red IPM ...
Страница 207: ......
Страница 208: ......
Страница 209: ......