OPTION
OPTION
OPTION
49
31
49a
Geprüft
Blatt:
Benennung
Änd.-Nr.
Datum
Nr.
Zeichnungs-Nr.
Name
A
Typ:
Zahl kommt vor
Gezeichnet
Normgepr.
Datum
Name
Blattzahl:
Für diese Zeichnung behalten wir uns alle Rechte vor (Gemäß DIN 34)
Ersatz für :
Änd. Nr. :
Hako-Werke GmbH
D-23840 Bad Oldesloe
Abt:
KABI
Plot-Datum:
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
1
0
1 2
0
Legende
**
At variant without on-board-charger
the main contactor K01 is not needed.
Connect the wires K01/K1/1 and K01/K2/1
to the stud terminal X30.
Connect the wires K01/K3/1 and K01/K4/1
to the stud terminal X31.
Fix the wire K01/A/1 at the
wire harness W2 with cable ties.
The wire set WS5 is not applicable
X30
1
X31
1
F06
5A
2
1
K03
flashing relay
E02
flash light
31
LR
W5
1
0,75
35410
W3
3
1,0
X11
1
W11
1,0
E01
head light
31
P
W11
1,0
X11
2
X09
A/1
F03
5A
2
1
4
71250
W2
1,0
horn
2
1
S02
33011
W2
3
0,75
72050
W2
5
0,75
H01
horn
N
P
4
33011
W2
0,75
4
72050
W2
0,75
V01
K
A
S01
key switch
2
3
73250
W7
3
1,0
73250
W7
2
1,0
V02
A
K
buzzer
30
86
87
87a
85
6
8
5
2
4
K02
X10
2
33521
1
W3
0,5
G01D
BN/1
BP/1
P
W8
35
X01
N
W1
72000
2
35
W8
35
W1
71200
2
35
K01
main relay
K2/1
K4/1
A/2
A/1
K3/1
K1/1
71250
2
WS3
16
96133152
71250
1
72050
1
96133145
72050
2
WS3
16
G02
on-board-charger
X3
72000
W7
5
1,0
BK
B P
B N
73211
1
W2
1,0
F01
7,5A
2
1
73210
2
W2
1,0
2
X2
1
X2
73250
1
W2
1,0
71250
3
W2
1,0
71250
5
W2
1,0
72050
W3
9
1,0
X09
A/2
3
72050
W2
1,0
RD
W2
3
71200
1,0
33010
1
W2
0,75
35710
W2
1
0,75
WS1
35
G01C
BN/1
BP/1
WS1
35
G01B
BN/1
BP/1
WS1
35
G01A
BN/1
BP/1
X02.
1
2
WS2
73210
1
1,0
X09
B/3
head light
B
A
S03
S03.
warning beacon
B
C
A
99-7091-00
alarm
99-7092-00
head light
1
33522
1
W3
0,5
W5
2
0,75
W5
2
0,75
99-7092-00
head light
W5
3
1,0
X09
B/5
W5
3
1,0
W5
4
1,0
W5
12
1,0
W5
13
1,0
W5
14
1,0
W5
1
1,0
72000
6
WS5
1,0
or
+24V S01
+24V
GND
*
*
At variant without on-board-charger
the relay K01 is not needed.
The contact of G02 is bridged.
buzzer
**
X01.
N
P
W1.
71200
5
35
W1.
72000
3
35
only for
variant MMAN
only for
variant HAKO
91031054
RI
2011
2
2
Eingeführt lt.
2249-07
ELK
06.07.
6
470
06.07.11
Ri
B115 R
E01
head light
E02
flash light
F01
fuse controller 7,5A
F03
fuse horn 5A
F06
fuse working headlight 5A
G01A
battery
G01B
battery
G01C
battery
G01D
battery
G02
on-board-charger
H01
horn
K01
main relay
K02
buzzer
K03
flashing relay
S01
key switch
S02
horn
S03
head light
S03.
switch warning beacon
V01
recovery diode horn
V02
diode warning beacon
X01
battery connector DIN 2 pole
X01.
battery connector Anderson 2 pole
X02.
connector 2-pole
X09
junction 6-polig
X10
connector 2-pole
X11
connector 2-pole
X30
stud terminal M8
X31
stud terminal M8
Schaltplan B115 R
7090
1
5/3
5/12
5/16
5/1
4/3
4/48 5/2
4/50
3/19
5/17
Содержание ERIDE 30
Страница 19: ...3 Technical Data 19 ...
Страница 22: ...4 2 System Maintenance I The following maintenance work must be performed by an authorized Service Center 22 ...
Страница 23: ...4 3 System Maintenance II The following maintenance work must be performed by an authorized Service Center 23 ...
Страница 38: ...7 Mechanical Components 7 1 Squeegee Fig 7 1 38 ...
Страница 40: ...7 1 Mechanical Components 7 1 Squeegee Abb 30 Fi 7 3 Abb 30 Fig 7 2 Fig 7 3 Fig 7 2 40 ...
Страница 44: ...7 2 Forward and Reverse Switch The pictures below show the wiring of the switch 44 ...
Страница 45: ...7 3 Mechanical Components 7 3 Brush Head Lifting Unit 45 ...
Страница 46: ...7 3 Mechanical Components 7 3 Brush Head Lifting Unit 46 ...
Страница 76: ...11 Adjustment of Disk Brake 76 ...
Страница 80: ...12 2 Notes 80 ...