Calibration procedure:
Before applying power
1. Verify that no conductive material is present on the printed
circuit board.
2. Ensure that all jumpers are properly set.
3. Set the following trimpots full counterclockwise (CCW):
• IR COMP
• ACCEL
• DECEL
4. Set the following trimpots to their center of travel:
• MAX SPD
• TACH
• BAL
5. Set the CURRENT LIMIT trimpot full clockwise (CW).
6. Make no adjustment to the OFFSET and LOOP trimpots.
7. Set the speed adjust potentiometer or input signal to zero
speed.
8. Set the ENABLE/DISABLE switch to DISABLE, or remove
the jumper between the ENBL and COM terminals of
terminal board TB502.
9. Set the FWD/REV switch to the desired direction, or insert or
remove a jumper as required between the DIR and COM
terminals of terminal board TB502.
10. Set the INHIBIT switch to RUN, or remove the jumper
between the INHIBIT and COM terminals of terminal board
TB502.
35
Calibration
250-0281.qxd 4/4/01 11:16 AM Page 35
Содержание NRGD-4Q Series
Страница 9: ...vii Regenerative Drives Figure 1 Four Quadrant Operation...
Страница 12: ...x Notes...
Страница 15: ...3 Dimensions Figure 2 NRGD05 Series Dimensions ALL DIMENSIONS IN INCHES MILLIMETERS...
Страница 16: ...4 Dimensions Figure 3 NRGD10 Series Dimensions ALL DIMENSIONS IN INCHES MILLIMETERS...
Страница 17: ...5 Dimensions Figure 4 Heat Sink Dimensions for NRGD10 Series Drives...
Страница 33: ...21 Installation Figure 8 Regen Dump Circuit Connections To NRGD Drives...
Страница 57: ...45 Figure 15 Connection to DLC600 and PCM4 Application Notes Connection to other Minarik devices...
Страница 78: ...Notes...