Page
9
of
33
Place the Z plate on the front of the X plate. Line up the holes on the Z rails
with the (3) holes on each side of the X plate. (2) holes on the top on each
side and (1) hole on the bottom on each side. Carefully remove the top
plastic/rubber bearing block or tape on both rails. Insert a M3x16 machine
screw in the top hole on both rails and finger tighten a M3 nylock. Repeat
the process with the second hole on the rails. Carefully remove the
plastic/rubber bearing block or tape from the bottom of the Z rails. Insert a
M3x16 machine screw in the bottom hole on both rails and finger tighten a
M3 nylock.
Prop the X plate on its bottom using the router mount. Place (2) eccentric spacers
in the top, large holes on the back of the X plate. Insert (2) M8x40 machine screws
into the large holes in the front of the X plate and through the eccentric spacers.
Place an assembled v-wheel on the M8x40 machine screws and secure with (2) M8
nylock nuts.
Place (2) M8x40 machine screws in the large holes in the front of the X plate at the
bottom. Place standard spacers on the M8x40 machine screws, assembled v-
wheels, and secure with a M8 nylock nut.