28
2-way valve approximately 45
’
until the gauge indicates 0.3 to 0.5 Mpa.
6). Disconnect the charge set and the charging cylinder, and set the 2-way and 3-way valves to the open
position.
Be sure to use a hexagonal wrench to operate the valve stems.
7). Mount the valve stems nuts and the service port cap.
Be sure to use a torque wrench to tighten the service port cap to a torque 18N.m.
Be sure to check the gas leakage.
6.7 Re-installation while the outdoor unit need to be repaired
1. Evacuation for
the whole system
Procedure:
1).
Confirm that both the 2-way and 3-way valves are set to the opened position.
2). Connect the vacuum pump to 3-way valve
’
s service port.
3). Evacuation for approximately one hour
Confirm that the compound meter indicates -0.1Mpa.
4). Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge
needle does not move (approximately 5 minutes after turning off the vacuum pump).
5). Disconnect the charge hose from the vacuum pump.
Содержание MOA-07HN1-QC2
Страница 1: ...XSEU A 1202 SERVICE MANUAL MIDEA AIRCONDITIONER EUROPE MARKET SPLIT WALL MOUNTED TYPE X ON OFF SERIES...
Страница 11: ...9 3 Dimension 3 1 Indoor Units Figure 1 Figure 2...
Страница 15: ...13 5 Wiring Diagram 5 1 Indoor Units MSX 07HRN1 QC2 MSX 09HRN1 QC2 MSX 12HRN1 QC2 MSX 18HRN1 QC2...
Страница 16: ...14 MSX 21HRN1 QB8W MSX 24HRN1 QB8W...
Страница 17: ...15 5 2 Outdoor Units MOA 07HN1 QC2...
Страница 18: ...16 MOA1 09HN1 QC2 MOA 09HN1 QC2 MOB1 12HN1 QC2 MOB 12HN1 QC2...
Страница 19: ...17 MOF 18HN1 QC2...
Страница 20: ...18 MOF1 21HN1 QB8W MOF3 24HN1 QB8W...
Страница 32: ...30 Use torque wrench to tighten the service port cap to a torque of 18N m Be sure to check for gas leakage...
Страница 35: ...33 Ionizer Plasma function indicator This indicator illuminates when Ionizer Plasma function is on...