27
6). Set the 3-way valve to the closed position immediately.
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
Disconnect the charge set, and tighten the 2-way and 3-way valve
’
s stem nuts.
Use a torque wrench to tighten the 3-way valves service port cap to a torque of 1.8 kgf.m.
Be sure to check for gas leakage.
2. Air purging by the refrigerant
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the closed position.
2). Connect the charge set and a charging cylinder to the service port of the 3-way valve.
Leave the valve on the charging cylinder closed.
3). Air purging
Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut on
the 2-way valve approximately 45
’
for 3 seconds then closing it for 1 minute; repeat 3 times.
After purging the air, use a torque wrench to tighten the flare nut on the 2-way valve.
4). Check the gas leakage
Check the flare connections for gas leakage.
5). Discharge the refrigerant
Close the valve on the charging cylinder and discharge the refrigerant by loosening the flare nut on the
Содержание MOA-07HN1-QC2
Страница 1: ...XSEU A 1202 SERVICE MANUAL MIDEA AIRCONDITIONER EUROPE MARKET SPLIT WALL MOUNTED TYPE X ON OFF SERIES...
Страница 11: ...9 3 Dimension 3 1 Indoor Units Figure 1 Figure 2...
Страница 15: ...13 5 Wiring Diagram 5 1 Indoor Units MSX 07HRN1 QC2 MSX 09HRN1 QC2 MSX 12HRN1 QC2 MSX 18HRN1 QC2...
Страница 16: ...14 MSX 21HRN1 QB8W MSX 24HRN1 QB8W...
Страница 17: ...15 5 2 Outdoor Units MOA 07HN1 QC2...
Страница 18: ...16 MOA1 09HN1 QC2 MOA 09HN1 QC2 MOB1 12HN1 QC2 MOB 12HN1 QC2...
Страница 19: ...17 MOF 18HN1 QC2...
Страница 20: ...18 MOF1 21HN1 QB8W MOF3 24HN1 QB8W...
Страница 32: ...30 Use torque wrench to tighten the service port cap to a torque of 18N m Be sure to check for gas leakage...
Страница 35: ...33 Ionizer Plasma function indicator This indicator illuminates when Ionizer Plasma function is on...