17
1. Air purging with vacuum pump
1) Completely tighten the flare nuts of the indoor and outdoor units, confirm that both the
2-way and 3-way valves are set to the closed position.
2) Connect the charge hose with the push pin of handle lo to the 3-way valves gas
service port..
3) Connect the charge hose of handle hi connection to the vacuum pump.
4) Fully open the handle Lo of the manifold valve.
5) Operate the vacuum pump to evacuate.
6)
Make evacuation for 30 minutes and check whether the compound meter indicates -0.1Mpa.
If
the meter does not indicate -0.1Mpa after pumping 30 minutes, it should be pumped 20 minutes
more. If the pressure can’t achieve -0.1Mpa after pumping 50 minutes, please check if there are
some leakage points.
Fully close the handle Lo valve of the manifold valve and stop the operation of the vacuum
pump. Confirm that the gauge needle does not move (approximately 5 minutes after
turning off the vacuum pump).
7) Turn the flare nut of the 3-way valves about 45° counterclockwise for 6 or 7seconds
(Indoor unit)
(Liquid side)
(Gas side)
Vacuum
pump
Vacuum
pump
Lo
Hi
Handle Hi
Two-way valve
Close
Manifold valve
Compound meter
Pressure
gauge
-0.1MPa
Handle Lo
Charge hose
Charge hose
(Outdoor unit)
Close
Three-way valve
Содержание MFE-60AMN1-RB4W
Страница 6: ...3 2 Dimension 2 1 Indoor Unit Dimension Mode W mm D mm H mm 55K 600 358 1900...
Страница 9: ...6 4 Wiring diagram 4 1MFE 60AMN1 RB4W Indoor Unit Outdoor Unit...
Страница 10: ...7 4 2MFE 60ARN1 RB4W 2T0043800026 Indoor Unit Outdoor Unit...
Страница 11: ...8 4 3MFE 60ARN1 RB4W 2T0043800036 Indoor Unit Outdoor Unit...
Страница 49: ...46 9 3 8 Overload of current...
Страница 50: ...47 9 3 9 Indoor outdoor unit communication error...