24
Procedure:
1).
Confirm that both the 2-way and 3-way valves are set to the opened position.
2). Connect the vacuum pump to 3-way valve
’s service port.
3). Evacuation for approximately one hour. Confirm that the compound meter
indicates -0.1Mpa.
4). Close the valve (Low side) on the charge set, turn off the vacuum pump, and
confirm that the gauge needle does not move (approximately 5 minutes after turning off
the vacuum pump).
5). Disconnect the charge hose from the vacuum pump.
Содержание MFE-60AMN1-RB4W
Страница 6: ...3 2 Dimension 2 1 Indoor Unit Dimension Mode W mm D mm H mm 55K 600 358 1900...
Страница 9: ...6 4 Wiring diagram 4 1MFE 60AMN1 RB4W Indoor Unit Outdoor Unit...
Страница 10: ...7 4 2MFE 60ARN1 RB4W 2T0043800026 Indoor Unit Outdoor Unit...
Страница 11: ...8 4 3MFE 60ARN1 RB4W 2T0043800036 Indoor Unit Outdoor Unit...
Страница 49: ...46 9 3 8 Overload of current...
Страница 50: ...47 9 3 9 Indoor outdoor unit communication error...