Installation and User Manual
Start-up
Following servicing, proceed in the following order: (see Figure 5-5)
1.
Close switches Q5N on the UPS units.
2.
Close switch Q5N in the external bypass unit.
3.
Open switch Q3BP in the parallel-connection unit.
4.
Close switches Q1 and QF1 on the UPS units.
5.
Start the inverters (press the "inverter ON" buttons
7
).
Figure 5-5: Start-up Procedure After Isolation Diagram.
Figure 5-6: Redundancy for Increased Output Diagram.
2
1
Q3BP
Galaxy 1
Galaxy 2
2
1
Galaxy 3
2
1
Galaxy 4
2
Q5N
1
2
Q1
QF1
Q5N
Q4S
2
3
4
1
0
1
0
Q3BP
Q5N
Q1
Q4S
QF1
0 1
Q5N
Q5N
Q1
Q4S
external bypass
4
5
1
0
1
0
1
0
1
0
1
0
1
6
1
0
7
8
1
0
1
0
1
0
Maintenance
5 — 5
86-133060-00 A00
Содержание GALAXY PW 100
Страница 6: ...This page left blank intentionally Galaxy PW UPS 100 to 225kVA vi 86 133060 00 A00...
Страница 22: ...This page left blank intentionally Galaxy PW UPS 100 to 225kVA Introduction 1 10 86 133060 00 A00...
Страница 34: ...This page left blank intentionally Galaxy PW UPS 100 to 225kVA 2 12 86 133060 00 A00...
Страница 78: ...This page left blank intentionally Galaxy PW UPS 100 to 225kVA 5 8 86 133060 00 A00...
Страница 88: ...This page left blank intentionally Galaxy PW UPS 100 to 225kVA Appendices A 10 86 133060 00 A00...
Страница 90: ...This page left blank intentionally Galaxy PW UPS 100 to 225kVA Appendices A 12 86 133060 00 A00...
Страница 92: ...This page left blank intentionally Galaxy PWTM UPS 100 to 225 kVA A 14 86 133060 00 A00...
Страница 94: ...Galaxy PWTM UPS 100 to 225 kVA 86 133060 00 A00...
Страница 96: ...This page left blank intentionally Galaxy PW UPS 100 to 225kVA W 4 86 133060 00 A00...
Страница 100: ...This page left blank intentionally Galaxy PW UPS 100 to 225kVA G 4 86 133060 00 A00...
Страница 102: ......
Страница 103: ......