Description
Ref. No.
Cross brace STB ....................
29-406-70
Flange screw 18 ....................
29-401-10
Fixing screw 35/DW15 ..........
29-401-20
Twin channel 80/22...............
29-406-35
Fig. 39.1
STB 450 with horizontal StarTec formwork; attach-
ment of the STB cross brace and the support frame
to the multi-function profile using flange screw 18
Fig. 39.2
STB 450 with vertical StarTec formwork; attachment of
the STB cross brace and the STB to the multi-function
profile using flange screw 18
Fig. 39.3
STB 450 with horizontal StarTec formwork; attach-
ment of the STB cross brace to the multi-function
profile using flange screw 18 and of the STB through
the tie hole using fixing screw 35
Fig. 39.4
STB 450 with vertical StarTec formwork; attachment of the
STB cross brace to the multi-function profile using flange
screw 18 and of the support frame through the tie hole
using fixing screw 35
Inside corner with cross brace STB and STB 450
Figures 39.1 and 39.3 show
the cross brace being used with
horizontal StarTec formwork. In
Fig. 39.1 the STB 450 is attached
to the multi-function profiles of
the horizontal large-size panel
and the height-extension panel
using flange screw 18.
Fig. 39.3 shows the attachment
of the STB to the StarTec panels
using fixing screw 35.
Figures 39.2 and 39.4 show the
attachment of the STB 450 to a
vertical large-size StarTec panel
and a height-extension panel.
Fig. 39.2 shows the attachment
to the multi-function profile
using flange screw 18, and
Fig. 39.4 shows the attachment
using the tie hole with fixing
screw 35.
Due to their greater stiffness,
we recommend using large-size
panels in the lower area.
Due to the size of the STB 450,
it is always necessary to install a
vertical panel next to the inside
corner to avoid interference with
the support frames.
Attention
The distance between the inside
corner and the attachment of the
STB 450 should not be greater
than 2.90 m!
Attention
Æ
Refer the separate STB load
charts for the permissible loads
as a function of pouring height
and fresh-concrete pressure.
2.863 m
2.822 m
2.80 m
2.90 m
STB-39
Technical Instruction Manual / Status November 2019
STB
Support frame