20
SHK 200S
SHK 200S-6
Lift from the pallet to final posi
-
tioning
Scrapping
Drain doors
Recommended alternative for
leading off condensation water
Condensation run off
Condensation runs out on to the ground below MET
-
ROAIR L. To avoid damage to the house and heat
pump, the condensation must be gathered and
drained away.
The condensation water is lead to an indoor drain
(subject to local rules and regulations).
Route the pipe downward from the air/water heat
pump.
The condensation water pipe must have a water seal
to prevent air circulation in the pipe.
• The condensation water (up to 50 litres / 24 hrs)
must be routed away by a pipe to an appropriate
drain, it is recommended that the shortest outdoor
length possible is used.
• The section of the pipe that can be affected by
frost must be heated by the heating cable to pre-
vent freezing.
•
Route the pipe downward from METROAIR L.
• The outlet of the condensation water pipe must
be at a depth that is frost free or alternatively in-
doors (with reservation for local ordinances and
regulations).
• Use a water trap for installations where air circu-
lation may occur in the condensation water pipe.
• The insulation must be tight against the bottom of
the condensation water trough.
When scrapping, the product is removed in reverse
order. Lift by the bottom panel instead of a pallet!
Before lifting remove the packaging and the securing
strap to the pallet.
Place lifting straps around each machine foot. Lifting
from the pallet to the base requires four persons, one
for each lifting strap.
It is not permitted to lift anything other than the ma-
chine feet.
IMPORTANT
It is important to the heat pump function that condensa-
tion water is led away and that the drain for the conden-
sation water run off is not positioned so that it can cause
damage to the house.
IMPORTANT
Self regulating heating cables must not b econnected.
IMPORTANT
The electrical installation and wiring must be carried out
under the supervision of an authorised electrician.
Water seal
Joint
LEK
Frostfritt
Frost proof
depth
Joint
Water seal
Frost
proof
depth
Chapter 5 |
Outdoor unit METROAIR L
Содержание SHK 200S
Страница 2: ......
Страница 70: ...70 SHK 200S SHK 200S 6 Diagram of electrical connections Chapter 13 Technical data...
Страница 71: ...71 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Страница 72: ...72 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Страница 73: ...73 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Страница 74: ...74 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Страница 75: ...75 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Страница 76: ...76 SHK 200S SHK 200S 6...
Страница 77: ...77 SHK 200S SHK 200S 6...
Страница 78: ...78 SHK 200S SHK 200S 6...
Страница 79: ......
Страница 80: ...METRO THERM A S RUNDINSVEJ 55 DK3200 HELSINGE INFO METROTHERM DK WWW METROTHERM DK 08 242 1909...