![Metro Therm SHK 200S Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/metro-therm/shk-200s/shk-200s_installation-and-operating-manual_1779421014.webp)
14
SHK 200S
SHK 200S-6
Pipe dimensions and materials
SHK 200S
Gas pipe
Liquid pipe
Pipe replacement Ø15,88 mm (5/8”)
Ø9,52 mm (3/8”)
Connection
Connection – (5/8") Connection – (3/8”)
Material
Quality of copper SS-EN 12735-1 or
C1220T, JIS H3300
Minimum ma
-
terial thickness
1,0 mm
0,8 mm
External diam-
eter, copper
pipe (mm)
B, using
R410A (mm)
B, using a
conventional
tool (mm)
Ø 9,52
0,0~0,5
0,7~1,3
Ø 15,88
Ø 6,35
1,0~1,5
Ø 12,7
External
diameter,
copper
pipe (mm)
Torque
(Nm)
Tightening
angle
(°)
Recom
-
mended
tool length
(mm)
Ø6,35
14~18
45~60
100
Ø 9,52
34~42
30~45
200
Ø12,7
49~61
30~45
250
Ø 15,88
68~82
15~20
300
Pipe connection
• Execute the pipe installation with the mainte-
nance valves (QM35, QM36) closed.
METROAIR L6 / METROAIR L8
•
Remove the side panel on METROAIR L during
the installation to make access easier.
Socket connections
Extension:
Shift:
METROAIR L12
•
Remove the “to be removed” part from the exter
-
nal panel at the METROAIR L mode where pipes
are to be led. The drawing below presents exem-
plary pipe outlets.
•
Make sure that no water or dirt can permeate to the
pipes.
Contamination of the pipes may damage
the heat pump.
A
B
Vacuum
pump
Serviceventil, gas
Mätuttag
Manometer
Serviceventil, vätska
Zawór serwisowy,
ciecz
Zawór serwisowy,
gaz
Wyjście pomiarowe
Manometr
Pompa
próżniowa
A
B
Vacuum
pump
Serviceventil, gas
Mätuttag
Manometer
Serviceventil, vätska
Zawór serwisowy,
ciecz
Zawór serwisowy,
gaz
Wyjście pomiarowe
Manometr
Pompa
próżniowa
A
B
Vacuum
pump
Serviceventil, gas
Mätuttag
Manometer
Serviceventil, vätska
Zawór serwisowy,
ciecz
Zawór serwisowy,
gaz
Wyjście pomiarowe
Manometr
Pompa
próżniowa
IMPORTANT
When soldering, apply the shielding gas.
External diameter,
copper pipe
A (mm)
Ø 6,35
9,1
Ø 9,52
13,2
Ø 12,7
16,6
Ø 15,88
19,7
SHK 200S
SHK 200S-6
• Bend pipes with maximum bending radius (at
least R100~R150). Do not bend pipes many
times. Use a bending machine.
• Connect the socket connection and tighten with
appropriate torque. Apply the appropriate tight-
ening angle if the torque wrench is not available.
SHK 200S-6
Gas pipe
Liquid pipe
Pipe replace-
ment
Ø12,7 mm (1/2”)
Ø6,35 mm (1/4”)
Connection
Connection – (1/2") Connection – (1/4”)
Material
Quality of copper SS-EN 12735-1 or
C1220T, JIS H3300
Minimum ma
-
terial thickness
1,0 mm
0,8 mm
Front
Elements to be removed
Chapter 4 |
Pipe connections
Содержание SHK 200S
Страница 2: ......
Страница 70: ...70 SHK 200S SHK 200S 6 Diagram of electrical connections Chapter 13 Technical data...
Страница 71: ...71 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Страница 72: ...72 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Страница 73: ...73 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Страница 74: ...74 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Страница 75: ...75 SHK 200S SHK 200S 6 Chapter 13 Technical data...
Страница 76: ...76 SHK 200S SHK 200S 6...
Страница 77: ...77 SHK 200S SHK 200S 6...
Страница 78: ...78 SHK 200S SHK 200S 6...
Страница 79: ......
Страница 80: ...METRO THERM A S RUNDINSVEJ 55 DK3200 HELSINGE INFO METROTHERM DK WWW METROTHERM DK 08 242 1909...