Controls, Connectors, Indicators & Menus
AVTMBITE 3 Rev 8 April 2014
9
Figure-3: BITE 3 Battery Charger Connections
Switches and Connectors
S1 switch
The on-off switch energizes/de-energizes the
instrument. It takes about 30 seconds to boot-up
and about ten seconds to shut down.
J1 Lead set
The lead sets are connected here. The connector is
keyed.
J2 CT
The optional external CT, when used, connects into
J2. It is also keyed.
J3 (Com & Printer)
The communications and printer cable connects to
J3 to communicate to a PC or laptop and to the
optional printer
J4 Battery charger
The output of the charger connects to the battery
here. The instrument is designed to prevent usage
while it is being charged as a safety item.
J5 Battery State
The state of the battery is evident by the number of
LED bars when this button is pushed – about 10%
per LED bar. See the section “Battery State
Indicator” below.
J6 Slow Charge
By pressing the slow charge button while
connecting the charger, the battery will slow charge
and take about 48 hours. See the section “Battery
State Indicator” below.
J4
J6
J5
Содержание BITE 3
Страница 2: ......
Страница 3: ...BITE 3 Battery Impedance Test Equipment...
Страница 22: ...M AVTMBITE 3 Rev 8 April 2014 16 M...
Страница 28: ...M AVTMBITE 3 Rev 8 April 2014 22 M...
Страница 32: ...M AVTMBITE 3 Rev 8 April 2014 26 M...
Страница 40: ...M AVTMBITE 3 Rev 8 April 2014 34 M...