Test Procedures
AVTMBITE 3 Rev 8 April 2014
19
Step Three: Select a Site/String and Take Measurements.
1.
After a site/string has been selected, measure ambient temperature and enter
it in the BITE 3. Press the “enter” key after typing the temperature.
Measure I New Test BATTERY_LAB_SMALL_6
Air Temp:
68
F
Ripple:
0.000
Amps
Float:
0.000
Amps
Waiting for trigger…
Strap
2.
Measure float and ripple currents by measuring across a strap like a shunt
(Patent Pending)
.
Note: The accuracy of the float and ripple current measurements is dependent upon
the value of the shunt being used to calculate them. It is recommended to use an
intertier (interrow) cable. See the Technical Specifications section for accuracy.
3.
Measure all cells and intercell connectors. Apply the Red Probe to the
positive terminal and the other to the negative terminal.
Cell
Strap
Note: In the lower part of the LCD, a few measurements are displayed.
One "!" means the cell is in warning mode.
Two "!!" means the cell is in the fail mode.
Step Four: Perform Post-Test Activities.
1.
When all of the testing is complete, remove the lead set and CT, if used.
2.
Analyze the data on screen to look for anomalies.
3.
And/or download the data into Power DB.
4.
Print the data with the optional printer to leave a record at the site.
5.
Turn off the BITE 3 by pressing the on-off (O | I).
Содержание BITE 3
Страница 2: ......
Страница 3: ...BITE 3 Battery Impedance Test Equipment...
Страница 22: ...M AVTMBITE 3 Rev 8 April 2014 16 M...
Страница 28: ...M AVTMBITE 3 Rev 8 April 2014 22 M...
Страница 32: ...M AVTMBITE 3 Rev 8 April 2014 26 M...
Страница 40: ...M AVTMBITE 3 Rev 8 April 2014 34 M...