Test Procedures
AVTMBITE 3 Rev 8 April 2014
21
5.
Continue testing cells and straps as necessary, making appropriate
connections and pushing the red "test" button on the top panel of the BITE
3 to start the measurements.
6.
Once the measurement is complete, continue testing until all cells/jars have
been tested.
7.
Follow Step Four,
Perform Post-Test Activities
from above.
Reviewing and retesting
Follow the same procedure as described above.
Содержание BITE 3
Страница 2: ......
Страница 3: ...BITE 3 Battery Impedance Test Equipment...
Страница 22: ...M AVTMBITE 3 Rev 8 April 2014 16 M...
Страница 28: ...M AVTMBITE 3 Rev 8 April 2014 22 M...
Страница 32: ...M AVTMBITE 3 Rev 8 April 2014 26 M...
Страница 40: ...M AVTMBITE 3 Rev 8 April 2014 34 M...