363-208-010, Appendix 1
NJ00675A-2 Dual Power Feed Unit Installation Procedure
Issue 1
November 1998
1-3
during the procedure. Nonetheless this procedure should be scheduled
during a low usage maintenance period.
Procedural Risk Assessment (DPFU added to an
in-service system)
Rating:
MEDIUM
Installing the DPFU in an in-service system constitutes a MEDIUM
procedural risk rating, since there is a potential for a service interruption
to the end customer, if any procedural deviations or procedure specific
equipment failures occur during the procedure. This procedure should be
scheduled during a low usage maintenance period.
Equipment
Equipment List
The following equipment, apparatus, and tools are required to perform this
Modification Implementation Procedure.
NOTES:
Code
Comcode
Qty
Note
Description
NJ00675A-2, L1
601869118
1
Dual Power Feed Unit
NE00675-31, G1
1
R
Cable Assembly (on DPFU)
NE00675-31, G2
1
R
Cable Assembly (PIU to DPFU)
NE00675-31, G3
1
R
Cable Assembly (DPFU to GRD)
4
R
Mounting Screws
4
R
6 Gauge Crimp Terminals
1
R
MIP 363-208-501 (Instructions)
1
I
Volt-Ohmmeter
1
I
Crimping Tool (6 gauge)
Содержание SLC-2000 Access System Central Office Terminal
Страница 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Страница 4: ...This page is intentionally blank...
Страница 10: ...viii Issue 5 May 1997 Contents...
Страница 16: ...xiv Issue 5 May 1997 Tables...
Страница 24: ...1 ii Issue 5 May 1997 Contents General Information...
Страница 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Страница 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...