363-208-010
Installation Procedures
Issue 5
May 1997
2-3
Erecting and Placement
Floor Layout
Bay Footprint
Step 1:
Mark the frame name and number on the floor in the space where the
frame is to be located. This will help later in locating frame positions
when the bays arrive. Cover the markings with a clear shellac if a period
of time is expected before the arrival of the bays so that markings do not
rub off the floor.
Step 2:
Refer to Figure 2-1 for bay framework dimensions.
NOTE
:
Refer to the SUPPLEMENTARY INFORMATION section for
alternative framework information
Step 3:
Refer to Figure 2-1 for floor marking. Mark the floor 26 inches wide for
each bay, and use the center of each bay as the reference line. This
means that the 25.875 inch wide bay is placed into the 26 inch wide
space allowed for each bay.
NOTE
:
The network bay frameworks have a center line marking on the
front and rear base of the framework which should be lined up
with the center line marked on the floor when the bays are
positioned.
Содержание SLC-2000 Access System Central Office Terminal
Страница 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Страница 4: ...This page is intentionally blank...
Страница 10: ...viii Issue 5 May 1997 Contents...
Страница 16: ...xiv Issue 5 May 1997 Tables...
Страница 24: ...1 ii Issue 5 May 1997 Contents General Information...
Страница 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Страница 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...