A3-14
Issue 1
November 1998
363-208-010, Appendix 3
Test Head Installation
Figure 1-6.
Test Head Analog Wiring P14
50
45
40
35
30
26
1
5
10
15
20
25
W/BL
W/GR
R/0
R/GR
R/BR
BK/BL
TIP
BL/W
GR/W
O/R
GR/R
BL/BK
BR/R
RING
Wiring Side
P14
p/o 955-7000xxx036 Cable Assembly
N/C
TAP 1 A F
N/C
N/C
N/C
N/C
N/C
N/C
TAP 1 B F
TAP 1 B E
N/C
N/C
N/C
TAP 1 A E
Bypass Pair
TAP 1 C F
TAP 1 C C
N/C
N/C
RJ/11 (P4)
RJ/11 (P3)
N/C
N/C
N/C
N/C
N/C
TAP 1 A F
N/C
N/C
N/C
N/C
N/C
N/C
TAP 1 B F
TAP 1 B E
N/C
N/C
N/C
TAP 1 A E
Bypass Pair
TAP 1 C F
TAP 1 C E
N/C
N/C
RJ/11 (P4)
RJ/11 (P3)
N/C
N/C
N/C
N/C
W/BL
BL/W
W/BL
BL/W
Note:
N/C = not used or required
Jumper
Jumper
Содержание SLC-2000 Access System Central Office Terminal
Страница 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Страница 4: ...This page is intentionally blank...
Страница 10: ...viii Issue 5 May 1997 Contents...
Страница 16: ...xiv Issue 5 May 1997 Tables...
Страница 24: ...1 ii Issue 5 May 1997 Contents General Information...
Страница 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Страница 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...