363-208-010, Appendix 1
NJ00675A-2 Dual Power Feed Unit Installation Procedure
Issue 1
November 1998
1-9
Requirement: -42 to -56VDC
Step 18: Engage all four (4) GMT type 0.5 Amp fuses.
Step 19: Verify that the green Power LED lights on the front panel.
Step 20: Verify on P2 (Alarms) terminal strip that there is no continuity (using
VOM as ohmmeter) between terminals 1 and 2 and 3 and 4 respec-
tively.
Step 21: Open 45 or 50 Amp. circuit breaker A on the BDFB. Green Power LED
should remain lighted. Verify A Alarms LED lights and that continuity
exists between P2 (Alarms) terminals 1 and 2 (A).
Step 22: Restore circuit breaker A then open 45 or 50 Amp. circuit breaker B on
the BDFB. Green Power LED should remain lighted. Verify B Alarms
LED lights and that continuity exists between P2 (Alarms) terminals 3
and 4 (B).
Step 23: Restore circuit breaker B.
Step 24: Replace plastic cover on DPFU faceplate.
Step 25: Procedure complete.
DPFU In-Service Change Out (Hot
Swap)
Description
Design provisions have been established to allow the replacement of a DPFU,
under certain conditions. with a replacement unit without a service interruption.
The conditions are such that a A or B alarm is declared indicating a problem with
internal diode modules and/or the control board, while both primary voltages and,
at least one secondary voltage remain normal. In this case it is clear that the unit
must be replaced since the anticipated protection inherent to the unit may not be
Содержание SLC-2000 Access System Central Office Terminal
Страница 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Страница 4: ...This page is intentionally blank...
Страница 10: ...viii Issue 5 May 1997 Contents...
Страница 16: ...xiv Issue 5 May 1997 Tables...
Страница 24: ...1 ii Issue 5 May 1997 Contents General Information...
Страница 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Страница 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...