3-iv
Issue 5
May 1997
Contents
Cabling, Wiring, and Assembly
External Test Head Interconnections
96
■
General
96
■
Common Cables
96
RT
RMU Link ED7C723-30 Group 17
96
Reliance INTS Link Cable ED7C723-30 Group 18
97
DC Test Pair Cable ED7C723-35 Group 7
97
VF Pairs Multiple Cable ED7C723-34 Group 13
97
VF Pairs Cables ED7C723-35 Group 1, 2, or 3
98
Test Bus (TAP) Multiple Cable ED7C723-34 Group 14
98
DC Test Pair Cable ED7C723-35 Group 1, 2, or 3
98
4TEL RMU Interconnections
103
■
General
103
Power Cable ED7C723-34 Group 10
103
4TEL RMU Control Link Cable ED7C723-34 Group 9
104
DC Test Pair Cable ED7C723-35 Group 11
104
■
Reliance INTS Interconnections
106
General
106
Power Cable ED7C723-34 Group 15
106
Ringing Cable ED7C723-34 Group 16
107
INTS Control Link Cable
107
INTS Communications Cable
107
DC Test Pairs Cable ED7C723-35 Group 1, 2, or 3
107
VF Pairs Cable ED7C723-35 Group 1, 2, or 3
107
■
Line Test Fanout Interconnections
112
General
112
Power Cable ED7C723-34 Group 11
112
4TEL RMU Control Link Cable 846823763
112
Reliance INTS Control Link Cable ED7C723-34 Group 17
113
SLC-2000 /LTF Control Link Cable VA02706-XX
113
Содержание SLC-2000 Access System Central Office Terminal
Страница 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Страница 4: ...This page is intentionally blank...
Страница 10: ...viii Issue 5 May 1997 Contents...
Страница 16: ...xiv Issue 5 May 1997 Tables...
Страница 24: ...1 ii Issue 5 May 1997 Contents General Information...
Страница 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Страница 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...