2-16
Issue 5
May 1997
363-208-010
Installation Procedures
ED7C723-31 DS1 Feeder/Distribution Cable Kit Mounting Procedure
If optional DS1 Cable Assemblies [ED7C723-30 Groups 13()
*
-16()] have been
ordered they should be connected to their respective backplane connectors at this
time.
NOTE
:
Refer to the instructions contained in the ED7C723-31 Group 2() Kit or
refer to the Cabling, Wiring, and Assembly chapter of this manual for
details of this operation.
J1C265AA-1 ARM Shelf Mounting Procedure
Step 1:
Mount the shelf using its attached hardware to its designated bay posi-
tion.
Step 2:
Locate the ground strap attached to the ARM shelf and connect it to the
bay frame as indicated in Figure 2-5.
NOTE
:
Remove any paint as necessary on the bay frame to ensure a
low-resistance contact.
Step 3:
Move the attached shelf cable assemblies forward so that they drape
into the bay frame’s cable duct areas. Leave the connectors in place at
this time for future connection to the Intra-bay and Customer Interface
cable assemblies.
NOTE
:
The following connectors on the shelf dangler cables should be
visible in their respective ducts:
*
The parenthesis after the group number of the cable assembly means that there may be an alpha
character after the numeric character, e.g., Group 2 or Group 2A or Group 2B.
Left Duct
Right Duct
P171
P302-1
P275
P302-2
P302-3
P302-4
P303
P304
Содержание SLC-2000 Access System Central Office Terminal
Страница 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Страница 4: ...This page is intentionally blank...
Страница 10: ...viii Issue 5 May 1997 Contents...
Страница 16: ...xiv Issue 5 May 1997 Tables...
Страница 24: ...1 ii Issue 5 May 1997 Contents General Information...
Страница 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Страница 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...