363-208-010
Cabling, Wiring, and Assembly
Issue 5
May 1997
3-33
Step 4:
ED7C723-30 Group 14(). Patch the P167/P161 connector of the cable
assembly to the J167/J161 jack of the ARM backplane (DS1 IN). Secure
the connection with the attached connector screws.
Step 5:
ED7C723-30 Group 16(). Patch the P168/P160 connector of the cable
assembly to the J168/J160 jack of the ARM backplane (DS1 IN). Secure
the connection with the attached connector screws.
Step 6:
Route these two cable assemblies up over the top of the ARM shelf, over
the top of the first two cable assemblies and then towards the right (as
viewed from the rear of the shelf). The ferrite beads should not lay upon
each other. Refer to Figure 3-19.
Step 7:
Secure all four cable assemblies together with cable ties using the top of
the ARM shelf’s tie points. Refer to Figure 3-19.
Step 8:
Let the cable J165 to J168 or J160 to J163 connectors dangle in the
duct for future connections to the mating DSX cables.
Содержание SLC-2000 Access System Central Office Terminal
Страница 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Страница 4: ...This page is intentionally blank...
Страница 10: ...viii Issue 5 May 1997 Contents...
Страница 16: ...xiv Issue 5 May 1997 Tables...
Страница 24: ...1 ii Issue 5 May 1997 Contents General Information...
Страница 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Страница 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...