363-208-010
Installation Procedures
Issue 5
May 1997
2-17
If DS1 Distribution cables have been provided their connectors should be
draped into the cable duct as follows:
4G Fan Shelf Installation
NOTE
:
Only one 4G Fan Shelf is required for the RT Bay configured for metallic
distribution only. The shelf must be located at the specific location depicted
in Figure 2-5. A second 4G Fan Shelf is required when the bay is to be
equipped with HDOS shelves when configured as a host terminal for areas
served via the FITL. This Fan Shelf shall be located above the HDOS
shelves as depicted in Figure 2-7.
Mounting Procedure
Step 1:
Open the carton and inspect the shelf and all its connectors and cable
assemblies for damage or misalignment.
Step 2:
The ESD ground path is through the shelf mounting bracket. Remove
the protective covering on the back side of the Fan shelf mounting
bracket.
Step 3:
Mount the shelf using its attached hardware to its designated bay posi-
tion.
J114
J303
J500-1
J500-2
J500-3
J500-4
Left Duct
J165
J166
J167
J168
Left Duct
Right Duct
Содержание SLC-2000 Access System Central Office Terminal
Страница 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Страница 4: ...This page is intentionally blank...
Страница 10: ...viii Issue 5 May 1997 Contents...
Страница 16: ...xiv Issue 5 May 1997 Tables...
Страница 24: ...1 ii Issue 5 May 1997 Contents General Information...
Страница 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Страница 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...