3-ii
Issue 5
May 1997
Contents
Cabling, Wiring, and Assembly
Test Access Path (TAP) Interface
29
■
TAP Bay Cable Assembly ED7C723-34 Group 1
29
DS1 Connections
32
■
General
32
■
Installation Procedure for DS1 Distribution/Feeder Cable Kit
ED7C723-31 Group 2A
32
HDOS Interconnections
35
■
General
35
■
Connecting Procedure for Power Cable Assembly
ED7C723-34 Group 5
35
Connections
36
■
Connecting Procedures for Transmission Cable Assembly
ED7C723-34 Group 6
38
Connections
38
DSX-1 Interconnections
41
■
General
41
■
Connecting Procedure for Power Cable Assembly
ED7C723-35 Group 17
41
Connections
41
Customer Interface Cable Connections
43
External DC Power and Ringing Supply Connections
46
■
General
46
■
DC Power Connections
47
■
Ringing Connections
47
Tests
48
Miscellaneous Discrete Environment Alarms
and Controls
49
■
General
49
■
Connections ED7C723-35 Group 1, 2, or 3
49
Содержание SLC-2000 Access System Central Office Terminal
Страница 1: ...SLC 2000 Access System Customer Assembly Manual for RT Frames 363 208 010 Issue 5 May 1997...
Страница 4: ...This page is intentionally blank...
Страница 10: ...viii Issue 5 May 1997 Contents...
Страница 16: ...xiv Issue 5 May 1997 Tables...
Страница 24: ...1 ii Issue 5 May 1997 Contents General Information...
Страница 34: ...2 iv Issue 5 May 1997 Tables Installation Procedures 2 1 Dimensions for Figure 2 2 6...
Страница 66: ...3 viii Issue 5 May 1997 Contents Cabling Wiring and Assembly...