PyroTec™ PRO utilizes a fixed deck layout. The carriers should be used in the same position
where they are left during installation.
Barcode
Identification
Barcodes on the carriers and on most of the individual containers can be identified.
6 Installation
Purpose of
This Chapter
This chapter describes:
•
How to prepare the site for installation of the PyroTec™ PRO instrument
6.1 Site and System Preparation
Site
Requirements
•
Verify the installation site against the general site requirements.
•
Describe any modifications needed.
Date of
Delivery
Determine the date of delivery.
6.1.1 Site Requirements
Delivery Route
Take the following points into consideration with regard to transport of the instrument
within a site:
Loading platform
Is there a loading platform or similar de-
vice?
Is it suitable for unloading the instrument
from a truck?
Load capacity of elevator
At least 400 kg / 882 lbs.
Minimum size of elevator
According to instrument size
Doors and entryway openings
Wider than 940 mm / 37 in.
Passageway corners
Are the passageways wide enough to
transport the instrument around corners?
Space
Is there
enough space
for all of the
components
Check the size of the room where the instrument will be installed:
•
Enough space to place instrument, cabinet, and extensions?
•
Enough space to open doors of instrument and cabinet?
•
Enough walking space around the instrument?
•
Space for placing system liquid/waste containers?
•
Space for the control computer?
Minimum space between instrument and wall:
•
10 cm/ 4 in.