PyroTec™ PRO Hardw are User’s Manual, V1.2
70
RT-MN024-1.2 02/21
8.3.4 Instrument Preparation and Checks
General
Information
This section contains instructions for routine use. It is intended as a guide to build your
SOP (Standard Operating Procedure).
Any modifications of the implemented tests in your Application Software must be carried
out by application specialists or expert operators.
Before starting a run, pay attention to the following:
ATTENTION
In the event of power failure or an otherwise aborted run, all partially processed samples
should be discarded. Do not attempt to restart an interrupted program unless the com-
puter screen displays explicit instructions for resuming operation.
Consumables
•
Check the disposable tip rack and add tips if necessary.
•
Make sure that all carriers and labware are properly positioned in accordance with the
Lonza PyroTec™ PRO deck layout.
•
Ensure that the daily maintenance has been carried out according to the maintenance
chapter.
•
Make sure that the splash protection of the DiTi waste unit is mounted.
ATTENTION
Unsatisfactory pipetting result
ATTENTION
Risk of contamination by liquid splashing on the worktable during DiTi ejection.
The cover for the DiTi waste slide must always be installed. This prevents liquid from
splashing onto the worktable and thus minimizes contamination risks.
WARNING
Check for tip clearance when using the 1000 µl DiTis
Worktable
Regarding the worktable, pay attention to the following:
ATTENTION
Improper positioning of objects on the worktable may lead to disturbances or errors in the
process, e.g. misinterpretation of barcodes. Do not use free space on the worktable to de-
posit any objects