PyroTec™ PRO Hardw are User’s Manual, V1.2
50
RT-MN024-1.2 02/21
6.2 Unpacking
Check before
unpacking
Note
: Unless otherwise specified a contracted field specialist will perform this procedure.
Check the following, before unpacking the instrument:
•
Is the packaging damaged in any way?
•
Is the instrument damaged in any way?
•
Is the delivered material complete according to the “Order Configuration/Packing List”
for the instrument?
Unpacking and
Positioning
•
If the cabinet needs to be screwed down to the floor (if a centrifuge is used, this is al-
ways the case): Use the drilling template and set the required screw anchors.
•
If applicable: Place the cabinet in its proper position.
•
If applicable: Screw the cabinet down to the floor.
•
Unpack the instrument (Leave the transport locks and moorings in place).
•
Place the instrument onto the workbench or cabinet using the special transport han-
dles.
•
Remove the side pillars (A)
•
Level the instrument as required.
Packaging
materials
The instrument packaging has been designed to prevent damage to instrument and parts
during normal transport conditions.
Keep the packaging materials for future use.