![Lindsay FIRLDNET GSM CELLULAR RTU Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/lindsay/firldnet-gsm-cellular-rtu/firldnet-gsm-cellular-rtu_installation-manual_1919636003.webp)
P/N 1389990 Rev B (ECN 32099)
3
Spread Spectrum Installation Guide
Table of Contents
General Safety ............................................................................................................... 5
1.0 Introduction ............................................................................................................. 8
2.0 FieldNET Safety ....................................................................................................... 8
3.0 FieldNET System and Components ....................................................................... 9
3.1 FieldNET RTU ..................................................................................................... 10
3.2 Repeater .............................................................................................................. 10
3.3 Bridge .................................................................................................................. 10
3.4 Base RTU ............................................................................................................ 11
3.5 Basic Link ............................................................................................................ 11
3.6 UHF Neulink/Skyline Radios ................................................................................ 12
3.7 High Speed Internet ............................................................................................. 12
3.8 Web Portal ........................................................................................................... 12
3.9 Service Plans ....................................................................................................... 12
4.0 Design and Installation ......................................................................................... 13
4.1 Create Map of Installation Site ............................................................................. 13
4.2 Build Order .......................................................................................................... 14
4.3 Bridge and Base RTU Installation ........................................................................ 14
4.4 Repeater Installation ............................................................................................ 17
4.5 RTU Installation ................................................................................................... 22
4.6 Verify/Modify Design ............................................................................................ 25
4.7 Verify System Operation ...................................................................................... 27
5.0 Wiring Diagrams .................................................................................................... 28
5.1 FieldBOSS/FieldVISION ...................................................................................... 28
5.2 FieldBASIC
–
monitor/stop .................................................................................. 29
5.3 FieldBASIC
–
monitor/start/stop........................................................................... 30
5.4 AIMS Advanced
–
monitor/stop ........................................................................... 31
5.5 AIMS Advanced
–
monitor/start/stop ................................................................... 32
5.6 AIMS Basic
–
monitor/stop .................................................................................. 33
5.7 AIMS Basic
–
monitor/start/stop........................................................................... 34
5.8 Valley Mechanical/Basic
–
monitor/stop .............................................................. 35
5.9 Valley Mechanical/Basic
–
monitor/start/stop ...................................................... 36
5.10 Valley Select
–
monitor/stop .............................................................................. 37
5.11 Valley Select
–
monitor/start/stop ...................................................................... 38
5.12 Valley CAMS Pro
–
monitor/stop ....................................................................... 39
5.13 Valley CAMS Pro
–
monitor/start/stop ............................................................... 40
5.14 Pressure Switch Installation ............................................................................... 41
Appendix ...................................................................................................................... 42
A. Design Examples .................................................................................................. 42
B. Computer Requirements for Web Portal ............................................................... 47
C. Google Earth ......................................................................................................... 48
D. GPS ...................................................................................................................... 49
E. FieldNET RTU
–
Additional Information ................................................................ 49
Содержание FIRLDNET GSM CELLULAR RTU
Страница 1: ...Spread Spectrum Installation Manual PN 13 8999 0 Rev B ECN 32099 GSM CELLULAR RTU SX N3000 SX R3000...
Страница 2: ...P N 1389990 Rev B ECN 32099 2 Spread Spectrum Installation Guide...
Страница 28: ...P N 1389990 Rev B ECN 32099 28 Spread Spectrum Installation Guide 5 0 Wiring Diagrams 5 1 FieldBOSS FieldVISION...
Страница 29: ...P N 1389990 Rev B ECN 32099 29 Spread Spectrum Installation Guide 5 2 FieldBASIC monitor stop...
Страница 30: ...P N 1389990 Rev B ECN 32099 30 Spread Spectrum Installation Guide 5 3 FieldBASIC monitor start stop...
Страница 31: ...P N 1389990 Rev B ECN 32099 31 Spread Spectrum Installation Guide 5 4 AIMS Advanced monitor stop...
Страница 32: ...P N 1389990 Rev B ECN 32099 32 Spread Spectrum Installation Guide 5 5 AIMS Advanced monitor start stop...
Страница 33: ...P N 1389990 Rev B ECN 32099 33 Spread Spectrum Installation Guide 5 6 AIMS Basic monitor stop...
Страница 34: ...P N 1389990 Rev B ECN 32099 34 Spread Spectrum Installation Guide 5 7 AIMS Basic monitor start stop...
Страница 35: ...P N 1389990 Rev B ECN 32099 35 Spread Spectrum Installation Guide 5 8 Valley Mechanical Basic monitor stop...
Страница 37: ...P N 1389990 Rev B ECN 32099 37 Spread Spectrum Installation Guide 5 10 Valley Select monitor stop...
Страница 38: ...P N 1389990 Rev B ECN 32099 38 Spread Spectrum Installation Guide 5 11 Valley Select monitor start stop...
Страница 39: ...P N 1389990 Rev B ECN 32099 39 Spread Spectrum Installation Guide 5 12 Valley CAMS Pro monitor stop...
Страница 40: ...P N 1389990 Rev B ECN 32099 40 Spread Spectrum Installation Guide 5 13 Valley CAMS Pro monitor start stop...
Страница 41: ...P N 1389990 Rev B ECN 32099 41 Spread Spectrum Installation Guide 5 14 Pressure Switch Installation...