
Chapter 10 Installation and Testing operation
10-9
10.2.2 Regular check
Check the below items for 1~2 times half-yearly and take actions as below if required.
[Table 10.4] Regular check items
Check item
How to check
Criteria
Action to take
Ambient temperature
0~55
℃
Ambient moisture
Measure with
thermometer/
hygrometer
5~95%RH
Adjust as specified in general
spec.
(If used in panel, as based on
ambient criteria in panel)
Ambient
conditions
Ambient pollution
Measure corrosive
gas
No corrosive gas
allowed
Loosening , shaking
Move
communication
module
As mounted firmly
Tighten screw
Module
status
Dust, foreign matters By the naked eye
Shall not be attached
Terminal screw
loosened
Tighten with driver Shall not be loosened
Tighten
Compressed terminal
close
By the naked eye
As distanced suitable
Correct
Connection
status
Connector loosened By the naked eye
Shall not be loosened
Tighten connector locking
screw
Power voltage check
Measure voltage
between
AC 110/220V
terminals
AC 85~132V
AC 170~264V
Modify power supply
Содержание GLOFA-GM Series
Страница 355: ...Appendix A 12 A 3 Dimensions of appearance G3L CUEA Unit mm 118 0 130 5 35 0 250 0 ...
Страница 356: ...Appendix A 13 G4L CUEA 107 0 121 5 35 0 135 0 ...
Страница 357: ...Appendix A 14 G6L CUEB G6L CUEC Dimensions of G6L CUEB G6L CUEC are identical with each other 81 1 90 0 35 0 110 0 ...