
Chapter 10 Installation and Testing operation
10-7
2) Sequence of testing operation
Next is the sequence starting from PLC installation completed to testing operation.
START
Power on :
A) Confirm input power
B) Check communication cable connection
C) Power on
D) Check if power LED of power module is turned on
E) Check LED status of CPU module
If abnormal, refer toTroubleshooting in user’s manual of each PLC type.
F) Check if LED status of communication module is normal or not
If abnormal, refer to Chapter 11. Troubleshooting in this user’s manual
Frame definition: Define frame with frame definition and download to communication module.
Programming : Perform programming in GMWIN and download to CPU module.
Sequence check: Confirm the operation of communication module according to program.
Program modification: If abnormal in sequence program, modify it.
Program preservation:
1) Save program to floppy or hard disk.
2) Print circuit drawing and list with printer.
3) Write program to memory module as required.
END
Содержание GLOFA-GM Series
Страница 355: ...Appendix A 12 A 3 Dimensions of appearance G3L CUEA Unit mm 118 0 130 5 35 0 250 0 ...
Страница 356: ...Appendix A 13 G4L CUEA 107 0 121 5 35 0 135 0 ...
Страница 357: ...Appendix A 14 G6L CUEB G6L CUEC Dimensions of G6L CUEB G6L CUEC are identical with each other 81 1 90 0 35 0 110 0 ...