4-378
Service Manual
7558-
xxx
Go Back
Previous
Next
•
Tighten the two screws in the order shown.
Punch carriage assembly removal
1.
Open the finisher front door assembly.
2.
Remove the rear upper cover. See
“Rear upper cover removal” on page 4-383
.
3.
Remove the upper media bin assembly. See
“Upper media bin assembly removal” on page 4-425
.
4.
Remove the connector from the sensor (punch carriage shift HP) (A).
5.
Remove the top cover. See
“Top cover removal” on page 4-424
.
6.
Release the harness from the punch carriage assembly (B).
7.
Remove the connector from the punch carriage shift motor assembly (C).
8.
Release the two punch unit assembly harnesses from the three clamps on the rear of the finisher.
9.
Disconnect the two punch unit assembly harnesses from the main harness.
10.
Remove the screw securing the grounding wire (D) to the punch unit carriage assembly (B).
Rear
B
C
E
D
F
Rear
D
Tighten
second
Tighten first
Содержание X95 series
Страница 26: ...xxvi Service Manual 7558 xxx Go Back Previous Next ...
Страница 34: ...xxxiv Service Manual 7558 xxx Go Back Previous Next ...
Страница 52: ...1 18 Service Manual 7558 xxx Go Back Previous Next ...
Страница 464: ...3 112 Service Manual 7558 xxx Go Back Previous Next TTM theory of operations ...
Страница 471: ...Diagnostic aids 3 119 7558 xxx Go Back Previous Next 3TM theory of operations ...
Страница 477: ...Diagnostic aids 3 125 7558 xxx Go Back Previous Next 1TM theory of operations ...
Страница 483: ...Diagnostic aids 3 131 7558 xxx Go Back Previous Next High capacity feeder theory of operations ...
Страница 494: ...3 142 Service Manual 7558 xxx Go Back Previous Next ...
Страница 506: ...4 12 Service Manual 7558 xxx Go Back Previous Next 6 Remove the operator panel top cover ...
Страница 512: ...4 18 Service Manual 7558 xxx Go Back Previous Next 5 Remove the rear lower cover ...
Страница 528: ...4 34 Service Manual 7558 xxx Go Back Previous Next 8 Disconnect all the cables from the bridge PCBA ...
Страница 586: ...4 92 Service Manual 7558 xxx Go Back Previous Next 10 Remove the duct from the machine 11 Release the two hooks ...
Страница 619: ...Repair information 4 125 7558 xxx Go Back Previous Next 4 Detach the media feed lift motor ...
Страница 704: ...4 210 Service Manual 7558 xxx Go Back Previous Next 8 Remove the LED ...
Страница 730: ...4 236 Service Manual 7558 xxx Go Back Previous Next 14 Remove the flatbed scanner assembly ...
Страница 734: ...4 240 Service Manual 7558 xxx Go Back Previous Next 5 Disconnect the cable B 6 Remove the tension spring C ...
Страница 801: ...Repair information 4 307 7558 xxx Go Back Previous Next 5 Disconnect the cable B 6 Remove the bridge drive motor ...
Страница 953: ...Repair information 4 459 7558 xxx Go Back Previous Next 7 Remove sensor tray 5 pre feed C A C B Connector ...
Страница 1004: ...5 34 Service Manual 7558 xxx Go Back Previous Next P J675 2 P J676 3 P904 15 Plug Jack Callout Plug jack description Connects to ...
Страница 1038: ...6 12 Service Manual 7558 xxx Go Back Previous Next ...
Страница 1076: ...7 38 Service Manual 7558 xxx Go Back Previous Next Assembly 37 TTM media feed 2 ...
Страница 1112: ...7 74 Service Manual 7558 xxx Go Back Previous Next Assembly 71 Finisher punch 8 4 3 10 11 ...
Страница 1148: ...7 110 Service Manual 7558 xxx Go Back Previous Next Assembly 103 continued High capacity feed HCF media tray lift 2 1 4 6 7 5 3 ...
Страница 1150: ...7 112 Service Manual 7558 xxx Go Back Previous Next Assembly 104 High capacity feed HCF media feed unit 1 4 3 5 6 7 2 1 ...
Страница 1152: ...7 114 Service Manual 7558 xxx Go Back Previous Next Assembly 105 High capacity feed HCF media feed unit 2 1 2 3 4 7 6 5 ...
Страница 1158: ...7 120 Service Manual 7558 xxx Go Back Previous Next ...
Страница 1168: ...I 10 Service Manual 7558 xxx Go Back Previous Next ...