Figure 81. Connecting USB 3.0 cable
After installing the operator panel tray assembly, complete the following steps:
1. Reinstall the top cover (see
“Install the top cover” on page 134
2. Reconnect the power cords and any cables that you removed.
3. Install the server in the rack.
4. Power on the server and any peripheral devices.
Remove the front operator panel
Use this procedure to remove the front operator panel.
With the operator panel tray assembly removed from the system (see
“Remove the operator panel tray
) , complete the following steps to remove the front operator panel:
Step 1. Press on the two release tabs on the rear of the front operator panel, and carefully slide the
assembly out of from the tray assembly.
Figure 82. Front operator panel removal
If you are instructed to return the component or optional device, follow all packaging instructions, and use
any packaging materials for shipping that are supplied to you.
86
ThinkSystem SR850P Maintenance Manual
Содержание 7D2F
Страница 1: ...ThinkSystem SR850P Maintenance Manual Machine Types 7D2F 7D2G and 7D2H ...
Страница 8: ...vi ThinkSystem SR850P Maintenance Manual ...
Страница 20: ...12 ThinkSystem SR850P Maintenance Manual ...
Страница 172: ...164 ThinkSystem SR850P Maintenance Manual ...
Страница 176: ...168 ThinkSystem SR850P Maintenance Manual ...
Страница 186: ...178 ThinkSystem SR850P Maintenance Manual ...
Страница 187: ......
Страница 188: ...Part Number SP47A58972 Printed in China 1P P N SP47A58972 1PSP47A58972 ...