3) If there is any old thermal grease on the processor, gently clean the top of the processor using
an alcohol cleaning pad.
Note:
If you are applying new thermal grease on the top of the processor, make sure to do it
after the alcohol has fully evaporated.
4. If you are replacing a processor:
a. If the processor to be installed was removed from another system board, wipe the thermal grease
from the processor with an alcohol cleaning pad, and dispose of the cleaning pad after all of the
thermal grease is removed.
Note:
If you are applying new thermal grease on the top of the processor, make sure to do it after
the alcohol has fully evaporated.
b. Remove the processor identification label from the heat sink and replace it with the new label that
comes with the replacement processor.
c. Apply the thermal grease on the top of the processor with syringe by forming four uniformly spaced
dots, while each dot consists of about 0.1 ml of thermal grease.
Figure 104. Proper shape of the thermal grease
5. If you are replacing a heat sink, remove the processor identification label from the old heat sink and
place it on the new heat sink in the same location. The label is on the side of the heat sink closest to the
triangular alignment mark.
If you are unable to remove the label and place it on the new heat sink, or if the label is damaged during
transfer, write the processor serial number from the processor identification label on the new heat sink in
the same location as the label would be placed using a permanent marker.
6. Assemble the processor and heat sink, if these components are separate.
Notes:
• If you are replacing a processor, install the heat sink onto the processor and retainer while the
processor and retainer are in the shipping tray.
• If you are replacing a heat sink, remove the heat sink from its shipping tray and place the processor
and retainer in the opposite half of the heat sink shipping tray with the processor-contact side down.
To prevent the processor from falling out of the retainer, hold the processor-retainer assembly by its
sides with the processor-contact side up until you turn it over to fit in the shipping tray.
.
Hardware replacement procedures
107
Содержание 7D2F
Страница 1: ...ThinkSystem SR850P Maintenance Manual Machine Types 7D2F 7D2G and 7D2H ...
Страница 8: ...vi ThinkSystem SR850P Maintenance Manual ...
Страница 20: ...12 ThinkSystem SR850P Maintenance Manual ...
Страница 172: ...164 ThinkSystem SR850P Maintenance Manual ...
Страница 176: ...168 ThinkSystem SR850P Maintenance Manual ...
Страница 186: ...178 ThinkSystem SR850P Maintenance Manual ...
Страница 187: ......
Страница 188: ...Part Number SP47A58972 Printed in China 1P P N SP47A58972 1PSP47A58972 ...