Figure 57. Front VGA assembly installation
After installing front VGA assembly, complete the following steps:
1. Reinstall the fan cage (see
“Install the fan cage assembly” on page 61
)
2. Reinstall the top cover (see
“Install the top cover” on page 134
3. Reconnect the power cords and any cables that you removed.
4. Power on the server and any peripheral devices.
LOM adapter replacement
Use the following procedures to remove and install the LOM adapter.
Remove the LOM adapter
Use this procedure to remove the LOM adapter.
Before removing the LOM adapter:
1. Read the safety information and installation guidelines (see
).
2. Turn off the server and peripheral devices and disconnect the power cords and all external cables (see
“Power off the server” on page 11
).
3. If the server is installed in a rack, slide the server out on its rack slide rails to gain access to the top
cover, or remove the server from the rack.
4.
Watch the procedure
A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=
PLYV5R7hVcs-B2y7oAb54mfyuLrIusa_qE
.
5. Remove the top cover (see
“Remove the top cover” on page 133
).
To remove the LOM adapter, complete the following steps:
Step 1. Loosen the captive thumbscrew.
Step 2. Open the retention latch.
Step 3. Remove the screw that fixes the LOM adapter.
.
Hardware replacement procedures
69
Содержание 7D2F
Страница 1: ...ThinkSystem SR850P Maintenance Manual Machine Types 7D2F 7D2G and 7D2H ...
Страница 8: ...vi ThinkSystem SR850P Maintenance Manual ...
Страница 20: ...12 ThinkSystem SR850P Maintenance Manual ...
Страница 172: ...164 ThinkSystem SR850P Maintenance Manual ...
Страница 176: ...168 ThinkSystem SR850P Maintenance Manual ...
Страница 186: ...178 ThinkSystem SR850P Maintenance Manual ...
Страница 187: ......
Страница 188: ...Part Number SP47A58972 Printed in China 1P P N SP47A58972 1PSP47A58972 ...