Step 2. Insert the TCM/TPM adapter into the TCM/TPM connector on the system board.
Notes:
• Carefully handle the TCM/TPM adapter by its edges.
• Your TCM/TPM adapter might look slightly different from the illustration.
Figure 126. TCM/TPM adapter installation
After installing the TCM/TPM adapter, complete the following steps:
1. Finish installing the system board (see
“Install the system board” on page 121
2. Reinstall the top cover (see
“Install the top cover” on page 134
3. Reconnect the power cords and any cables that you removed.
4. Power on the server and any peripheral devices.
Top cover replacement
Use this procedure to install or remove the top cover.
132
ThinkSystem SR850P Maintenance Manual
Содержание 7D2F
Страница 1: ...ThinkSystem SR850P Maintenance Manual Machine Types 7D2F 7D2G and 7D2H ...
Страница 8: ...vi ThinkSystem SR850P Maintenance Manual ...
Страница 20: ...12 ThinkSystem SR850P Maintenance Manual ...
Страница 172: ...164 ThinkSystem SR850P Maintenance Manual ...
Страница 176: ...168 ThinkSystem SR850P Maintenance Manual ...
Страница 186: ...178 ThinkSystem SR850P Maintenance Manual ...
Страница 187: ......
Страница 188: ...Part Number SP47A58972 Printed in China 1P P N SP47A58972 1PSP47A58972 ...