Menu selection
Part 1 • Page 14-5
Part 1 – Operating Instructions
Rev. 4.00 December 2014
Software version 1.04
EcoRO Dia I/II (HT)
Part 1 • Ch
apter 14
14.4 Parameters for standby mode, menu item 4
(Requires main switch to be in position 2)
The process data for night-time mode (standby) can be viewed or
changed in the sub-menu standby mode parameters
Selecting the menu item
<< Switches to the previous menu
!Changed data are transferred!
Cursor up/ Change values
Cursor down/ Change values
OK Activate selection
The set parameters can be reset by selecting >Default setting<.
Parameter
Function
Range
Default setting
Interval stby:
Standby rinsing interval:
Time interval for flushing in standby mode
0…360 min
90 min
Duration stby
Duration of standby rinsing:
Duration of rinsing in standby mode
0…30 min
10 min
Temperature
discharge
Temperature discharge standby rinsing operation:
Activation (1 = yes) / Deactivation (0 = no)
of the temperature discharge during standby rinsing
Temperature range for start / stop
1/0
20…35°C / 95°F
1
Start 35°C / 95°F
Stop 33°C / 91.4°F
Pump M3
only (Eco)RO Dia II:
Switch on pump M3 during standby rinsing:
1 = yes / 0 = no
1/0
0
Impulse rinse
Switch impulse back washing on/off
1 = yes / 0 = no
1/0
0
Collect. alarm ZLT Suppress collect. alarm (ZLT) during standby?
1 = yes / 0 = no
1/0
0
Leak monitoring
Delay time of the leakage monitor
0…30 min
5 min
Tank filling delay
Delay time for tank filling
0…30 min
5 min
ISS enabled?
Impulse shear force rinsing (ISS) of the loop activated?
1 = yes / 0 = no
1 / 0
0
4 Prm Standby mode
A) Display
B) Entry
<<
ENTER
Standby interval
Duration standby
Temp. disch.standby
Pump M3 standby
Impulse rinse
Collect. alarm ZLT
Leakage monitoring
Delay filling tank
ISS enabled
Operating time ISS
Reaction time MV Y30
PSAL4 enabled?
Pump M3 Hot Rinse
Factory settings?
<<
OK