LAGUNATOOLS.COM
22
Connecting Power
NOTE:
A
“plug”
and cord are NOT included and must be installed by a
qualified technician/electrician, or the power cable connected (hard wired) to
an appropriate disconnect according to local codes.
A qualified electrician should do the connection. When completed, the
machine must conform to the National Electric Code and all local codes
and ordinances.
FUNCTION, Control Panel
Front
Figure 12: Control Box Components
Emergency
STOP
DRO
Conveyor
Height Speed
Conveyor Speed
Brush ON/OFF
(2, front & rear)
Brush Rotation
(2, front & rear)
Conveyor
UP/DOWN
Conveyor
ON/OFF
Conveyor Fuse,
Height Speed
Содержание SuperMax SuperBrush 24 x 2
Страница 1: ...OWNERS S MANUAL SuperBrush 24 x 2 SuperBrush 36 x 2 Lagunatools com...
Страница 25: ...LAGUNATOOLS COM 25 INTERNAL WIRING Figure 15 Internal Wiring...
Страница 34: ...LAGUNATOOLS COM 34 Exploded Views STAND ASSEMBLY 1of 2 Figure 22 Stand Assembly...
Страница 35: ...LAGUNATOOLS COM 35 STAND ASSEMBLY 2 of 2 elec hgt adj Figure 23 Stand Assembly electric height adj...
Страница 39: ...LAGUNATOOLS COM 39 HEAD ASSEMBLY Front 1 2 Figure 24 Head Assembly Front 1 2 without brush...
Страница 42: ...LAGUNATOOLS COM 42 CONVEYOR ASSEMBLY Figure 25 Conveyor Assembly...