8. - Instructions for work
MERGE MAXX 950
63
KN233BGB_C
Merger
8. Instructions for work
Before placing the machine in working
position:
- Check that nobody is within the machine
pivoting area.
- If there is someone, make sure the person
moves away.
8.1
Putting the machine into work
position
The hydraulic functions are controlled using
the AT10 terminal (Menu «Folding /
Unfolding»).
The work units must be in forward position
towards the tractor before unfolding the
machine.
- Press on the button F1 and keep it pressed down.
GB
CE
Содержание MERGE MAXX 950
Страница 2: ......
Страница 100: ...MERGE MAXX 950 100 10 Maintenance and storage KN233BGB_C Merger Cylinder pins Folding links...
Страница 104: ...MERGE MAXX 950 104 10 Maintenance and storage KN233BGB_C Merger The coupling yokes The parking stand The transport locks...
Страница 105: ...10 Maintenance and storage MERGE MAXX 950 105 KN233BGB_C Merger Skid shoe pivot points...
Страница 106: ...MERGE MAXX 950 106 10 Maintenance and storage KN233BGB_C Merger The right arm pivot points The left arm pivot points...