8. - Instructions for work
MERGE MAXX 950
81
KN233BGB_C
Merger
Putting the machine into work position:
- Set hydraulic valve in floating position:
• The right work unit is lowered.
a
: Side windrow delivery.
b
: Central windrow delivery.
Left work unit
Putting the machine in headland turn position:
- Press key F1.
a
b
Содержание MERGE MAXX 950
Страница 2: ......
Страница 100: ...MERGE MAXX 950 100 10 Maintenance and storage KN233BGB_C Merger Cylinder pins Folding links...
Страница 104: ...MERGE MAXX 950 104 10 Maintenance and storage KN233BGB_C Merger The coupling yokes The parking stand The transport locks...
Страница 105: ...10 Maintenance and storage MERGE MAXX 950 105 KN233BGB_C Merger Skid shoe pivot points...
Страница 106: ...MERGE MAXX 950 106 10 Maintenance and storage KN233BGB_C Merger The right arm pivot points The left arm pivot points...