Spreading Operation
B
122
AXIS-GENERAL
AXIS
20.1
AXIS
30.1 (W), AXIS 40.1 (W)
B.6
Calibration test
For precise control of the discharge amount we recommend running a new cali-
bration test every time you change fertiliser types.
Run the calibration test:
Before spreading for the first time.
If the fertiliser quality has changed greatly (moisture, high dust content,
cracked grain).
If a new fertiliser type is used.
The calibration test must be conducted (with engaged PTO shaft) at a standstill
or during travel over a test section.
B.6.1
Determine nominal output volume
Calculate the nominal output volume before starting the calibration test.
Calculate exact ground speed
The exact ground speed must be known to calculate the nominal output volume.
1.
Drive the
half full
solid fertiliser broadcaster over a
100 m
distance
in the
field
. Note the time required.
2.
Read the exact ground speed on the scale of calibration test calculator.
Figure 9:
Scale for calculating the exact ground speed
NOTICE
The calibration test is carried out using the electronic control system on the fol-
lowing models of the solid fertiliser broadcaster AXIS 30.1 W, AXIS 30.1 Q,
AXIS 40.1 W, AXIS 40.1 Q.
The calibration test is described in a separate operator's manual for the elec-
tronic control system. This operator 's manual is part of the electronic control
system.
Содержание AXIS 20.1
Страница 4: ......
Страница 12: ...Contents VIII...
Страница 14: ...Intended use 1 2 AXIS GENERAL...
Страница 46: ...Transport without tractor 6 34 AXIS GENERAL...
Страница 48: ...Instructions regarding the spreading process 7 36 AXIS GENERAL...
Страница 156: ...Maintenance and repair C 144 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W...
Страница 194: ...Appendix D 182 AXIS GENERAL AXIS 20 1 AXIS 30 1 W AXIS 40 1 W AXIS 50 1 W...
Страница 214: ......
Страница 215: ......